Hong Kong’s new South Island Line and Shatin to Central Link requires the expansion of Admiralty Station into Hong Kong’s first 4 line interchange station. Already the busiest interchange station in Hong Kong, expanding this station without interrupting services involves major rock mechanics challenges.

The new platforms are housed in shallow cavern and platform tunnels immediately adjacent to the existing platforms and under high rise buildings. To facilitate connection with the existing station, the Island Line platform tunnel needed to be underpinned and up to 30m of rock below it removed, while keeping trains running safely above.

Our speaker is: Harry Asche, Design Director Tunnels, Aurecon

Harry Asche is Aurecon’s Design Director, Tunnels. Harry has spent 35 years in the design and construction of public sector infrastructure. Harry’s experience includes road, rail, bridge and tunnel construction management, detailed design of bridges, roads and tunnels, and in the last ten years he has led multi-disciplinary teams in feasibility and planning studies for transportation projects in Australia, New Zealand and Asia.

Date: 5.30pm for 6 | 11th May 2017

Venue:  Hawken Auditorium, Engineering House, 447 Upper Edward Street, Spring Hill QLD

Key Speaker: Harry Asche (Aurecon / Design Director – Tunnels)

Event Contact: Harry Asche

Download the event flyer

Click here to register