Webinars

ATS NSW Tunnels and Underground Works for Pumped Storage Hydropower Projects Panel Discussion

Getting the most from ITA – A live presentation to the ATS and NZTS by the ITA President

Discrete fracture network approach for underground support design optimisation

Tunnelling Risk Management on the Forrestfield Airport Link Project

ATS Tunnel Design Guideline Presentation—Part 1

ATS Tunnel Design Guideline Presentation—Part 2

ATS Tunnel Design Guideline Presentation—Part 3

ATS Tunnel Design Guideline Presentation—Part 4

ATS Tunnel Design Guideline Presentation—Part 5